In 2018 Keen-Mark Group of Companies carried out a complex of works on movement of the consignment of power equipment (turbines and generators). There were 5 lots (100 and 150 tons) in the consignment. A self-propelled modular trailer (for withdrawal of the equipment from the warehouse), a hydraulic gantry system 44 A (for loading of the equipment onto the trailer) and motor transport (for transportation) were used during the implementation of the project. Unloading at the destination warehouse was fulfilled in a reverse order. It took only 6 days to fulfill the project.